Efficient Screening Technology: Technical Precision as an Economic Gamechanger
-
The operator of a screening plant had stockpiled unscreened sand without any marketing option.
-
A new screening plant had to be built within a tight timeframe and directly connected to existing silos.
-
Proximity to a residential area and complex connections required careful, low-emission design and construction to reduce dust and noise.
-
A flexible loading system was needed – dust-reduced into silos or moist into skips – to enable economical use and create added value.
GERWIN developed a bespoke screening plant directly on two existing silos, serving both filler sand and screened sand storage. Advanced technology enables low-dust silo loading, flexible discharge of moistened material, and low-emission operation. Precise planning and structured integration allowed rapid commissioning despite complex site requirements.
The plant delivers sustainable economic value: unscreened sand is now marketable, environmental and community protection is ensured, and operational efficiency sustainably improves the site’s profitability.
Adrian Hense
GERWIN Silotechnik GmbH
Auf dem Tigge 35
D-59269 Beckum
Efficient Screening Technology: Technical Precision as an Economic Gamechanger
-
The operator of a screening plant had stockpiled unscreened sand without any marketing option.
-
A new screening plant had to be built within a tight timeframe and directly connected to existing silos.
-
Proximity to a residential area and complex connections required careful, low-emission design and construction to reduce dust and noise.
-
A flexible loading system was needed – dust-reduced into silos or moist into skips – to enable economical use and create added value.
GERWIN developed a bespoke screening plant directly on two existing silos, serving both filler sand and screened sand storage. Advanced technology enables low-dust silo loading, flexible discharge of moistened material, and low-emission operation. Precise planning and structured integration allowed rapid commissioning despite complex site requirements.
The plant delivers sustainable economic value: unscreened sand is now marketable, environmental and community protection is ensured, and operational efficiency sustainably improves the site’s profitability.
Adrian Hense